Export Inspection · Bangladesh

The inspection you book decides what you can still fix.

Export inspection is not one service. It is a series of decision points spread across a production run, and they differ in one respect that matters far more than price: how much of the order is still changeable at the moment the inspector files the report. Book late and you learn what is wrong. Book early and you can still do something about it.

WHAT YOU CAN STILL DO
BEFORE THE ORDER
Change the factory
0% PRODUCED
Change fabric, trims and the spec
20–60% PRODUCED
Fix every unit not yet made
100% MADE
Only sort, rework or accept
Each row is something a later inspection cannot give back.
BEFORE THE ORDER
Factory audit
Whether this factory can make it at all, before a deposit moves.
0% PRODUCED
Pre-production check
Materials, trims and the first pieces off the line, before the lay is cut.
20–60% PRODUCED
During production
The line running, while the remaining units can still be corrected.
100% MADE, 80% PACKED
Final random inspection
Finished goods sampled to AQL. The shipment passes or it does not.
AT THE CONTAINER
Loading supervision
What actually goes into the box, the count, and the seal on the door.
01 · The Decision

Which Inspection Does This Order Need?

Start from your situation rather than from the menu. Almost every buyer who overspends on inspection is buying the wrong stage, not too many of them.

YOUR SITUATION
WHAT WE WOULD BOOK
First order from a factory you have never used, deposit already paid.
Pre-production check, then during production
Repeat order, same style, factory with a clean record over several seasons.
Final random inspection only
Long run, high order value, or a complex construction with many operations.
During production plus final
The last shipment failed inspection and the factory says it is fixed.
Root cause first, then a re-inspection
A batch has already been rejected and the ship date is close.
100% sorting with supervised rework
Shortages, wrong sizes or mixed cartons have arrived before.
Final inspection plus loading supervision
Several factories running at once and nobody on your side can watch them.
A resident inspector or a retained desk
02 · The Six Checkpoints

What Each One Catches — And What It Cannot

Every inspection has a blind spot. Knowing where it is matters more than the checklist, because that is where the next surprise comes from.

BEFORE THE ORDER

Factory audit

Capability, capacity, machinery, systems and records — assessed before you commit, so you are choosing a factory on evidence rather than on a showroom visit and a quoted price.

BLIND SPOTIt tells you what a factory can do, not what it will do on your order when it is overbooked in October.
Supplier verification and factory audit →
0% PRODUCED

Pre-production check

Bulk fabric against the approved swatch, trims against the trim card, and the first pieces off the line measured against the spec — before the lay is cut and the error multiplies.

BLIND SPOTA correct first piece says nothing about piece four thousand, when the operator has changed and the roll has run out.
Quality control inspection →
20–60% PRODUCED

During production

The line observed while it runs, with semi-finished and finished units sampled. The only stage where a fault can still be corrected on the units not yet made, which is why it is usually the best value of the five.

BLIND SPOTIt samples a moment. Problems that start after the inspector leaves will not appear until the final check.
During production inspection →
100% MADE, 80% PACKED

Final random inspection

The contractual gate. Run when production is complete and at least 80% is packed, with a random AQL sample drawn from finished cartons — workmanship, measurements, labelling, packing and quantity.

BLIND SPOTIt is a sample, not a census. A pass means the lot met the agreed limit, not that every piece is faultless.
Pre-shipment inspection (PSI) →
AT THE CONTAINER

Loading supervision

Container condition and cleanliness, carton count as loaded, correct styles and ratios going in, loading method, and the seal number recorded against the documents. Separate from quality — this is about what physically leaves.

BLIND SPOTIt verifies what goes in the box, not what is inside the carton. It never replaces a final inspection.
Add it to a booking →
EVERY WORKING DAY

Resident monitoring

An inspector inside the factory for the whole run rather than for a visit, enforcing daily gates, counting real output and catching material substitution at the roll.

BLIND SPOTIt is the most expensive option and rarely justified on a short run of a simple style with a known factory.
Resident production monitoring →
03 · Inside The Final Check

Eight Things Opened, Counted Or Measured

A final inspection is not a walk through the warehouse. These are the checks that produce the pass or fail, and the ones a thin report quietly skips.

1
Quantity and carton count
Cartons counted and the piece count verified by opening a sample, not accepted from the packing list. Shortages found here are cheap; found at your warehouse they are a claim.
2
Workmanship against AQL
A random sample drawn to the agreed inspection level, with defects classified critical, major and minor against the limits written into your purchase order.
3
Measurements
Spec points measured on a sample after pressing, where a garment that passed at the sewing line frequently fails, and compared against the approved tolerance rather than by eye.
4
Function and safety
Zips and fastenings operated, attachments pull-tested, and any product-specific test your buyer requires. Needle and sharp-object checks where the programme calls for them.
5
Labels and care content
Brand, size, origin, fibre content and care instructions against the approved artwork, in the language the destination market requires. A wrong label can hold a shipment at customs.
6
Packing and presentation
Polybag type and warnings, folding, hangers, barcodes scanned rather than looked at, and the assortment inside each carton against the ratio sheet.
7
Shipping marks
Carton marking, box dimensions and gross weights checked against the documents, because a mismatch here delays the shipment without a single garment being wrong.
8
Photographic record
Defects photographed and identified by carton and location, so the report can be acted on or disputed later without anyone relying on memory.
04 · If It Fails

Three Routes, And None Of Them Is Free

A failed inspection is a commercial decision, not a technical one. The question is which of these costs you least once the ship date is counted in.

A

Rework and re-inspect

The factory repairs the defective units and the lot is offered again. The right answer when the defect is correctable and the ship date has room. It is also where most buyers lose time, because the second inspection fails for the same reason as the first.

Costs: a second inspection fee and usually a week. Worth insisting that the cause, not the symptom, is fixed before you pay for the re-inspection.
B

Sort piece by piece

Every unit is checked and the lot is separated into shippable, reworkable and reject. Used when the defect rate is too high for a re-offer to be credible, or when you need to ship whatever is good by a fixed date.

Costs: a team and several days, charged by time. Recovers most of the order and gives you a defect breakdown the factory cannot argue with.
C

Accept with a concession

You take the goods knowing the defect level, against a price reduction or a credit. Sometimes the only sane answer for a seasonal product — a perfect shipment that arrives in February is worth less than an imperfect one in December.

Costs: margin, and a precedent. Worth documenting carefully so it is recorded as a one-off settlement rather than a new accepted standard.
05 · Questions

The Terms, Plainly

Most confusion about export inspection is vocabulary rather than substance. Four of these six are really the same question asked differently.

01
What is the difference between PSI, FRI and final inspection?
In practice, nothing. Pre-shipment inspection, final random inspection and final inspection all describe the same check at the same point: production complete and at least 80% packed, with a random AQL sample drawn from finished cartons. Different firms simply prefer different initials. The terms worth distinguishing are the stages — pre-production, during production, final and loading — because those genuinely do different things at different moments.
02
When should I book, and how much notice do you need?
Book the slot as soon as the ex-factory date is agreed, and confirm it when the factory reports around 70% packed. The common mistake is booking on the factory’s word that goods are ready: an inspector who arrives to find 40% packed either waits, comes back, or inspects a lot that does not meet the 80% condition. We ask for a few working days’ notice, and we will tell you plainly if the readiness figure you have been given looks unlikely.
03
What AQL should I ask for?
Whatever your buyer has written into the order. Where nothing is specified, the apparel default is General Inspection Level II with zero critical, 2.5 major and 4.0 minor. Tightening to 1.5 on majors costs more and is worth it for premium or safety-related products; loosening it rarely saves what it appears to. The defect classification matters as much as the number — agree in writing what counts as major before production, not after a failed report.
04
Does a pass mean the shipment has no defects?
No, and any report implying otherwise is misleading. AQL sampling establishes that the lot met an agreed limit based on a sample. Defects below that limit are expected and accepted by the standard you chose. If your tolerance is genuinely zero on a given defect, sampling cannot deliver it — that requires piece-by-piece sorting, and even that has a known detection limit.
05
Who pays when an inspection fails?
It depends on what your purchase order says, which is why it is worth settling before the first order rather than during the first failure. The common arrangement is that the buyer pays the first inspection and the supplier bears the cost of re-inspections caused by a failure. Where nothing is written, it becomes a negotiation at the worst possible moment. We invoice whoever booked us and say so clearly on the report.
06
Can you inspect at a factory we did not choose ourselves?
Yes — nominated factories, agent-appointed units and subcontracted sites are all inspectable, provided access is arranged. Flag it when booking, because a site that is not your direct supplier sometimes resists an inspector appointed by the buyer. Where access is refused, we report that refusal as the finding rather than rescheduling quietly, since it is usually the most informative thing that happened that day.
START HERE

Send the purchase order and the ex-factory date.

Those two are enough for us to say which stage this order actually needs and what it would cost. If the honest answer is one final inspection rather than a programme, that is what we will quote — selling you four checkpoints on a repeat order from a good factory is how an inspection budget stops being believed.