Building Safety · Bangladesh

Structural, Fire And Electrical Safety Verification

Confirmation of building safety certificates, fire-exit adequacy, and electrical inspection status from recognised bodies.

PURPOSE
Reduce catastrophic risk exposure and reputational liability.
RSCFSCD fire licenceDIFE factory licenceBNBC Part 4
VERIFICATION REGISTER
Every Document, One Status
Building / structural approval
VERIFIED
FSCD fire licence
EXPIRES SOON
DIFE factory licence
VERIFIED
Electrical inspection report
NOT PRODUCED
RSC coverage and CAP status
OPEN ITEMS
Boiler registration
NOT APPLICABLE
Illustrative register format. Every status is filled in from the original document and, where possible, confirmed with the issuing body.

Scope

The Three Things We Confirm

This is a verification service, not an engineering inspection. We confirm that the certificates exist, are current, were issued by a body that is actually recognised, and cover the building your order will be produced in. Where a structural, fire or electrical engineering survey is needed, that is a separate scope — see fire, electrical and structural safety inspection.

01
Building Safety Certificates
Structural and building approval for the specific building, floor-by-floor occupancy and load limits, any extension or vertical addition after the original approval, and the DIFE factory licence that depends on them. We check the address and plot on the document against the building you will actually be producing in.
Fails when: floors were added after approval, or the certificate names a different unit of the same group.
02
Fire-Exit Adequacy
A current fire licence from the Fire Service and Civil Defence, and whether the means of escape match what the licence assumed: number of exits per floor, exit and stair width against occupancy, travel distance to the nearest exit, fire-rated doors with working self-closers, door swing direction, unobstructed routes, signage, lighting and the assembly point.
Fails when: a licence is current but exits are locked, blocked by stock, or open inward.
03
Electrical Inspection Status
The date and author of the last electrical inspection, whether the inspector was competent and independent, the findings raised and whether they were closed, plus generator and boiler documentation where applicable. Electrical faults are a leading cause of industrial fire, so an undated or self-issued report carries no weight.
Fails when: the report predates a major load increase, or findings were never closed.

Recognised Bodies

Who Issues What, And Why Buyers Still Reject It

“We are fully compliant” usually means a folder of photocopies. Each document below proves something narrow, and each one gets rejected for a predictable reason.

DocumentIssued ByWhat It ProvesWhy It Gets Rejected
Factory licenceDepartment of Inspection for Factories and Establishments (DIFE)The unit is registered to operate, at a stated worker class.Lapsed renewal, or worker headcount has outgrown the licensed class.
Fire licenceFire Service and Civil Defence (FSCD)The premises met fire safety requirements for their size, use and risk at the time of issue.Expired, or the layout has changed since the licensed plan.
Building / structural approvalRAJUK or the relevant local authorityThe building as designed was approved for its occupancy and loads.Floors added after approval, or the approval covers a neighbouring plot.
RSC inspection and CAP statusRMG Sustainability CouncilThe factory is covered by the safety programme, and how much of its corrective action plan is verified as corrected.The factory is not on the covered list at all, or open high-severity findings remain.
Electrical inspection reportA competent independent electrical engineer or inspecting bodyThe installation was assessed against the applicable rules on a stated date.Self-issued, undated, unsigned, or superseded by a load increase.
Boiler registration and certificate of useThe boiler inspection authorityThe boiler is registered and was certified fit for use.Certificate expired, or the boiler on site is not the one on the certificate.
Environmental clearanceDepartment of EnvironmentThe unit is cleared to operate in its assigned environmental category.Category assigned before wet processing was added. See environmental audit.
We ask for originals, not photocopies. A licence that is current on paper does not prove the building is safe today, and a photocopy proves nothing about either. Where the issuing body allows it, we confirm the document against the issuer’s own record rather than trusting the copy in the folder.

Programme Status

The RSC, And Why Coverage Is The First Question

After the Rana Plaza collapse in 2013, brands and global unions created the Accord on Fire and Building Safety. In June 2020 its Bangladesh operations transferred to the RMG Sustainability Council (RSC), and the Bangladesh Safety Agreement took effect in November 2023 under the International Accord framework. The RSC runs inspection, remediation, training and a complaints mechanism.

The decisive question for a buyer is simple: is this factory on the covered list at all? Factories that are not listed by signatory companies are not inspected under the programme — and that is exactly where unverified risk sits.

1,926
Factory accounts covered by the RSC as of May 2026
27,917
Inspections carried out by the RSC from June 2020 to May 2026
81%
Of 156,325 total findings verified as corrected, data as of 30 June 2026
4,007
Boilers covered across 1,387 factories under the agreement
Time-sensitive: the agreement runs to 31 December 2026
The Bangladesh Safety Agreement is set to expire at the end of December 2026. Brands and the global unions IndustriALL and UNI have been preparing negotiations to renew it beyond that date. Until a renewal is concluded and published, any supplier assurance that rests purely on “we are RSC covered” should be treated as time-boxed, and your contract terms should say what happens if coverage lapses. We state the programme position on the date of each report rather than assuming continuity.

Paper Versus Reality

A Valid Certificate Is Not The Same As A Safe Building

Certificates record a moment. Buildings change after that moment. These are the eight gaps that open up between the paperwork and the floor.

01
Vertical Extension After Approval
Extra floors added to a structure approved for fewer. The original certificate stays valid-looking and says nothing about the added load.
02
Heavy Machinery On Upper Floors
Generators, boilers, water tanks or dyeing equipment placed above the floor the structural design allowed for.
03
Exits Locked Or Obstructed
The most common and most lethal finding. A licensed exit chained shut, blocked by cartons, or used as storage is not an exit.
04
Collapsible Gates And Inward Doors
Doors on escape routes that open against the direction of travel, or sliding and collapsible gates on the only stairway.
05
Fire Doors Without Self-Closers
Rated doors propped open for ventilation or convenience, which removes the compartmentation the design depended on.
06
Load Growth Beyond The Electrical Design
Added machines, air conditioning and lighting drawing on an installation last assessed years earlier, with extension boards doing structural work.
07
Untested Alarm And Pump Systems
Detection, alarm and fire pumps installed but never tested, with no maintenance record and no drill that proves anyone hears them.
08
Production In An Undeclared Building
Your order running in an annexe, a rented floor or a subcontractor that none of the certificates cover. Every document can be genuine and still irrelevant.

Deliverables

What You Receive

Scope note. This service verifies documents and observes conditions. It is not a structural, fire or electrical engineering survey, and we do not issue licences, certificates or structural opinions. Where our walkthrough raises a structural, fire-system or electrical concern, we say so plainly and recommend a qualified engineer — we do not certify the building ourselves.
How This Fits With Your Other Checks
Safety certificate verification
Answers: do the documents exist, are they current, and do they cover this building? This page.
Engineering inspection
Answers: is the structure, fire system and installation sound? See fire, electrical and structural safety inspection.
Social compliance audit
Answers: how are the workers treated? See social compliance and ethical audit.
Onboarding and re-checks

FAQs

Safety Verification FAQs

It confirms three things: that building safety certificates exist and are current, that fire exits are adequate for the occupancy and actually usable, and that an electrical inspection has been carried out by someone competent and its findings closed. Every document is checked against the building your order will be produced in, and confirmed with the issuing body where that is possible.

Verification confirms status: does the paperwork exist, is it current, does it cover this building, and are the exits usable today. An engineering inspection assesses the structure, fire systems and electrical installation themselves and requires qualified engineers. Most buyers need verification first, because it is faster and it tells you whether an engineering survey is even worth commissioning.

The Department of Inspection for Factories and Establishments issues the factory licence. The Fire Service and Civil Defence issues the fire licence. Building and structural approval comes from RAJUK or the relevant local authority. Boiler registration comes from the boiler inspection authority, and environmental clearance from the Department of Environment. For factories in the programme, the RMG Sustainability Council holds inspection and remediation records.

The RMG Sustainability Council took over the Accord’s Bangladesh operations in June 2020 and runs inspection, remediation, training and a complaints mechanism under the Bangladesh Safety Agreement, which took effect in November 2023. It does not cover every factory. Coverage depends on the factory being listed by signatory companies, so the first thing we check is whether your supplier is on the covered list at all.

The agreement runs to 31 December 2026, and brands together with the global unions IndustriALL and UNI have been preparing negotiations to renew it beyond that date. Until a renewal is published, treat coverage-based assurance as time-boxed and make sure your supply contract says what happens if coverage lapses. Each report we issue states the programme position on its own date.

No. A fire licence records that the premises met requirements for their size, use and risk at the time it was issued. It does not prove the exits are usable today. The most common and most dangerous findings — locked exits, routes blocked by stock, fire doors propped open, collapsible gates on the only stairway — all sit behind a perfectly valid licence.

Then the certificates for the main building may be genuine and completely irrelevant. We establish which building, which floors and which subcontracted units your order actually passes through, and verify documents for each of them. Production in an undeclared building is one of the most serious findings we report.

You receive a register showing exactly which documents are missing, expired or mismatched, separated from physical conditions that need action now. Paperwork gaps usually have a fixable timeline. Immediate physical danger — a blocked sole exit, visible structural distress — is escalated the same day, because the purpose of this work is to reduce catastrophic risk, not to produce a report about it.

NEXT STEP

Send Us The Factory Name And Address

We will tell you whether the unit appears on the covered list, which certificates we can confirm from documents alone, and what has to be seen on site. If anything looks immediately dangerous, you hear about it before the report is written.

Useful to include: the building address, floors used, and any subcontracted units your order passes through.