Building Safety Inspection

Fire, Electrical & Structural Safety Inspection Bangladesh

Independent engineering checks of your factory or office building in Bangladesh. We inspect fire protection, electrical systems and structure, rank every finding by risk, and track the fixes until they are verified.

Definition

What a Building Safety Inspection Checks

A fire, electrical and structural safety inspection is an engineering assessment of whether a building can resist and contain fire, distribute power without overheating or shock risk, and carry its loads without failing, measured against the Bangladesh National Building Code and buyer safety standards.

In Bangladesh these checks became a buyer requirement after the Tazreen Fashions fire in 2012 and the Rana Plaza collapse in 2013, which killed 1,134 people. Today the RMG Sustainability Council runs this programme for many garment factories.

Building safety in Bangladesh

Fire detection and sprinkler systems remain the slowest findings to close in RSC-covered garment factories, and buildings outside the programme have no independent tracking at all.

1,773Garment factories covered by the RSC as of 30 June 2026
Source: RMG Sustainability Council (RSC) Bangladesh Safety Agreement progress reporting, June 2026.

Who needs it

Who Needs a Safety Inspection?

Four situations where an independent fire, electrical and structural safety inspection helps.

Factories Outside the RSC Programme

The same three-discipline inspection — fire, electrical and structural — without being an RSC member.

RSC Factories With Open Findings

Help closing corrective-action-plan items and preparing evidence for RSC verification.

Buyers Checking Non-Covered Suppliers

An independent view of a supplier that no programme inspects, alongside supplier due diligence and export and buyer compliance.

Companies Leasing Offices or Warehouses

A check before you sign the lease or move staff into a building in Bangladesh.

Three disciplines

What Each Inspection Covers

Three engineers, three checklists, one combined report. Each discipline is scored and reported separately so the right team can act.

Fire safety

  • Fire alarm and detection system
  • Sprinklers and hydrants
  • Protected stairs and fire-rated doors
  • Exit routes, signs and emergency lighting
  • Fire separation and storage of flammables
  • FSCD fire licence (Fire Act 2003, s.4), drills and fire teams

Electrical safety

  • Main and distribution panels
  • Cable sizing, routing and protection
  • Earthing and lightning protection
  • Thermographic scan for hot spots
  • Generator and substation rooms
  • Single-line diagram and maintenance records

Structural safety

  • Visual check for cracks and overloading
  • Approved drawings and building permits
  • Floor loads against design
  • Column and slab condition
  • Extra floors or unapproved changes
  • Material tests and detailed engineering assessment where needed

Methods

How Our Engineers Inspect

We combine document checks with on-site testing, so findings are based on measurements, not just what the factory says.

Thermal imaging

Finds overheating breakers, cables and joints

Earth testing

Measures earthing resistance on panels

Egress measuring

Checks exit widths and travel distances

Rebound hammer

Non-destructive check of concrete strength

Drawing review

Compares the building with its approved plans

Alarm and pump tests

Tests detection, alarms and fire pumps on site

Risk ranking

Every Finding Ranked by Risk

Not every finding is equally urgent. We rank each one so money and time go to the biggest risks first.

CriticalImmediate danger to lifeStop use of the area or evacuate until made safe. Escalated to you the same day.
MajorSerious risk if not fixed soonCorrective action with a short, agreed deadline and interim controls.
MinorGap against code or good practiceFixed through the normal maintenance plan and checked at follow-up.

Remediation

Fixes Tracked Until They Are Verified

A report on its own does not make a building safer. We turn findings into a corrective action plan with owners and dates, check progress, and verify each fix on site before closing it. Reviewed by bpo.com.bd team.

Getting ready for a buyer social audit as well? See social compliance audit readiness.

Example tracker. Items move to Verified only after a follow-up visit with photo evidence.

Our commitments

Our Commitments on Building Safety

Qualification

Each discipline is inspected by a qualified engineer, and their registration is stated in the report.

Measurement

Findings come from tests and drawings, not from what the building owner says.

Escalation

Danger to life is reported before our engineers leave the site.

Verification

No finding is closed without a follow-up visit and photo evidence.

FAQs

Fire, Electrical and Structural Safety FAQs

Checking whether a factory can deliver your order as well? See the factory capability audit.

An engineering assessment of whether a building can contain fire, distribute power safely and carry its loads, measured against the Bangladesh National Building Code (BNBC) 2020 and buyer safety standards.

It checks the fire alarm and detection system, sprinklers and hydrants, protected stairs, fire-rated doors, exit routes, emergency lighting, storage of flammable materials, fire licence and drill records.

Main and distribution panels, cable sizing and routing, earthing and lightning protection, a thermographic scan for hot spots, generator and substation rooms, and electrical drawings and maintenance records.

When the visual check finds serious cracks, overloading, missing approved drawings or floors added without approval. A detailed engineering assessment then tests materials and checks the structure by calculation.

The Bangladesh National Building Code (BNBC) 2020, the Fire Prevention and Extinguishing Act 2003 and its rules, Bangladesh factory safety rules, and the safety standards your buyers use, such as the RSC technical guidelines for garment factories.

No. RSC inspections are carried out by the RSC for its member factories. We help factories and buyers prepare, close findings and check buildings that are outside the RSC programme.

Yes. Under section 4 of the Fire Prevention and Extinguishing Act 2003, a licence from the Fire Service and Civil Defence (FSCD) is required to use a building as a factory, workshop or warehouse.

Qualified engineers in each discipline — fire, electrical and structural. The engineers assigned to your inspection, and their registrations, are named in the report.

We tell the factory and the client before our engineers leave the site, and recommend stopping use of the affected area until it is made safe.

Yes. The same fire, electrical and structural checks apply to offices, warehouses and mixed-use buildings used by foreign companies in Bangladesh.

1) You send the address, number of floors and building use. 2) We confirm the scope, engineers and fee in writing. 3) We inspect on site. 4) You receive a risk-ranked report and a corrective action plan.

By the number of buildings and floors, the building use and the disciplines you need. We confirm the scope in writing before the visit.

Only the people you name. We do not share findings with buyers, landlords or authorities unless you ask us to or the law requires it.

Yes. We start from the existing report and corrective action plan, so verified items are kept and only open items are rechecked.

No. It records conditions on the day of the visit. Changes in use, loads or maintenance afterwards can create new risks, so follow-up checks remain necessary.

Make the building safe

Book a Building Safety Inspection

Tell us the building address, the number of floors and what the building is used for. We will confirm the scope, the engineers and the fee in writing.