Sourcing & Procurement · Bangladesh
Strategic RFQ And Open-Cost Benchmarking In Bangladesh
We screen qualified manufacturers, manage your Request for Quotation (RFQ) process end to end, and audit the raw-material and labour cost breakdowns behind every quote — so hidden middleman markups are removed before you commit to a price.
Definition
What Open-Cost Benchmarking Means
Open-cost benchmarking means the factory quotes a breakdown instead of a single price. Every cost line — raw material, trims, cut-make labour, factory overhead, wastage and declared margin — is stated separately, then tested against a should-cost model built from current market rates. The outcome is a quote you can negotiate line by line, instead of a number you can only accept or reject.
A should-cost model is built before the RFQ goes out. That order matters: it gives you an independent view of fair value, so the first price you hear does not become the anchor for the whole negotiation.
| Cost Line | What The Quote Must Declare | What We Verify |
|---|---|---|
| Raw material or fabric | Rate per unit, consumption per piece, wastage percentage | Mill booking rate and date, marker efficiency, consumption against the tech pack |
| Trims and accessories | Item-wise rate and consumption, nominated suppliers named | Supplier price lists, minimum order effect, substitution options |
| Cut-make labour (CM) | Standard minute value, minute rate, assumed line efficiency | Operation breakdown, industrial-engineering study, wage band for the district |
| Factory overhead | Allocation basis and percentage applied | Capacity utilisation, cost per machine hour, order size sensitivity |
| Wastage and rejects | Allowed percentage, stated per process | Cutting reports, reject logs, historical defect rate for the style type |
| Declared margin | Percentage applied, and on which cost base | Compared against the category norm for that volume and process |
| Freight, duty and landed cost | Incoterm basis, inland haulage, port and documentation charges | FOB against CIF against DDP, so the comparison stays like for like |
Cost lines vary by industry. Light engineering, plastics and packaging use the same structure with material, process time, tooling amortisation and overhead in place of fabric and CM.
Supplier Screening
How We Screen Qualified Manufacturers
Screening happens before price is discussed. A factory that quotes low but cannot hold quality or capacity is not a saving — it is a delay with a discount attached. A category longlist is narrowed to a short, defensible shortlist in five stages, drawing on our supplier identification and vendor shortlisting and supplier verification and factory audit work.
RFQ Management
How The RFQ Process Runs
The RFQ is run as a controlled process, not an email thread. Every bidder receives the same template, the same quantity assumption and the same delivery term, so the quotes that come back can actually be compared against each other.
Quality Capability
Factory QC Audit Benchmarked Against ISO 9001 Principles
Evaluation of the factory’s internal QC procedures, inspection records, calibration, and corrective-action discipline, benchmarked against ISO 9001 principles. The purpose is to predict whether quality will be consistent, not just acceptable on one visit.
One good inspection day proves very little. What predicts consistency is whether the factory writes down what it checks, keeps those records, calibrates the equipment it measures with, and closes defects out at root cause so the same fault does not return next season. A deeper on-site scope is covered on our supplier verification and factory audit page.
| Audit Area | What We Examine | ISO 9001 Principle It Maps To |
|---|---|---|
| Internal QC procedures | Documented inline, mid-line and final inspection steps, the sampling or AQL plan, and who holds sign-off authority | Process approach |
| Inspection records | Retention period, traceability to style and lot, defect coding, and whether pass or fail evidence actually exists | Evidence-based decision making |
| Calibration | Calibration status and schedule for gauges, scales, needle detectors and test equipment, with certificates on file | Control of monitoring and measuring resources |
| Corrective-action discipline | Root-cause records, closure time, verification of effectiveness, and whether the same defect keeps recurring | Improvement |
| Quality leadership | Whether the QC reporting line is independent of production output targets, and who can stop a line | Leadership |
| Competence | Inspector training records, operator-level quality awareness, and handover on shift change | Engagement of people |
Cost Transparency
Where Hidden Middleman Markups Appear
A hidden markup is usually not theft — it is a missing line. When a quote arrives as one number, commission, nominated-supplier spread and padded consumption all sit inside it with nothing to point at. Opening the cost sheet makes those lines visible and negotiable.
- One delivered price, no breakdown behind it
- Raw-material supplier nominated, rate not disclosed
- Commission folded inside the cut-make rate
- Sample and development charges bundled into unit price
- Consumption and wastage given as one total, not per process
- No direct contact with the factory that actually produces
- Line-by-line cost sheet on a fixed template
- Mill or supplier named, with booking rate and date
- Any commission shown as its own visible line
- Sample and development costs listed separately
- Consumption, marker efficiency and wastage stated per process
- Purchase contract signed directly with the manufacturer
Deliverables
What You Receive
- Verified factory shortlist with legal, capacity and compliance evidence
- One open-cost RFQ template every bidder must complete
- Should-cost model for each line of the quote
- Normalised quote comparison on a single Incoterm and order quantity
- Variance report showing which cost line drives the price gap
- QC capability audit report benchmarked against ISO 9001 principles
- Negotiation brief with target price and fallback positions
- Re-benchmark schedule so the awarded price stays tested
Who Uses This Service
This service sits inside our wider procurement and supply chain management work, and pairs with continuous re-screening and export and buyer compliance once an order is live.
FAQs
RFQ And Open-Cost Benchmarking FAQs
What is open-cost benchmarking?
Open-cost benchmarking is a sourcing method in which the factory quotes a line-by-line cost breakdown — raw material, trims, cut-make labour, factory overhead, wastage and declared margin — instead of a single unit price. Each line is then compared against a should-cost model built from current market rates, so you can see exactly which cost element is making the price high.
How is this different from using a buying house or sourcing agent?
A buying house usually gives you one price and keeps its commission inside that price. This works the other way round: the factory’s cost sheet is opened, our fee is separate and visible, and the purchase contract stays between you and the manufacturer.
Will Bangladeshi factories agree to give a full cost breakdown?
Many will, when the request arrives with a fixed template, a confirmed order quantity and a signed confidentiality undertaking. A factory that cannot produce a breakdown at all usually has weak internal cost control — which is itself useful information for the shortlist decision.
Do you audit the factory before or after the RFQ?
Before. The QC capability audit runs during screening, so only factories that can actually hold quality reach the RFQ stage. Price is then compared across capable factories, not across whoever quoted lowest.
Is the QC audit an ISO 9001 certification?
No. We evaluate internal QC procedures, inspection records, calibration and corrective-action discipline benchmarked against ISO 9001 principles. It is an independent capability assessment, not a certification, and we are not a certification body.
Which Bangladesh industries do you cover?
Apparel and knitwear, home textiles, leather and footwear, light engineering, plastics, packaging, and jute and agro-processing. The cost-line structure stays the same; only the material and process inputs change.
Do we contract directly with the factory?
Yes. The purchase contract sits between you and the manufacturer. We act as the screening, RFQ and cost-audit layer, which keeps both the commercial relationship and the cost sheet in your hands.
How long does one RFQ and benchmarking cycle take?
It depends on the category, how many factories need auditing and how many sample rounds the product needs. The schedule is agreed in writing in the scope document before work begins, rather than quoted as a generic turnaround.
Next Step
Send Us One Quote You Do Not Trust
Share a current quote or a tech pack. We will tell you which cost lines are missing, what a should-cost model for that item looks like, and whether the factory behind the price can hold quality order after order.
