A scorecard with no consequence attached is only a report.
Most buyers already have supplier numbers somewhere. What they usually lack is a person in Dhaka who collects those numbers from a source the factory does not control, puts them in front of the factory on a fixed date, and is still there the following week to see whether anything actually changed.
Five Numbers, Measured The Same Way Every Month
Four or five metrics is enough. A card with fifteen on it gets read once, argued about, and then quietly ignored — which is the same outcome as having no card at all.
Two Documents That Run The Week
The scorecard is monthly. Between scorecards, the desk runs on two live records that anyone on your side can open without asking a factory for an update.
When Something Has To Be Put Right
Rework, replacement, a credit, a shortage made good. These conversations are won or lost on what was written down at the time, which is months before anyone realises there is going to be a conversation.
Assemble the evidence
Before anything is raised, the file is built: what was ordered, what arrived, what was found, when, and by whom. A claim that arrives as an assertion gets negotiated. A claim that arrives with a file gets answered.
- Purchase order and approved sample
- Inspection reports with dates and sample sizes
- Photographs identified by order and carton
- Counts, packing list and goods-received figures
- The messages where the issue was first raised
Support the discussion
We sit in the conversation with the factory, in the same time zone and in the same language, and keep it on the file rather than on who said what. Our role is to hold the record steady, not to decide your commercial position for you.
- Meeting held in person where it matters
- The file presented, point by point
- Factory response recorded as given
- Options put to you with what each costs
- Your decision carried back, unaltered
Document the settlement
Whatever is agreed is written down the same day, in terms specific enough to act on: the remedy, the quantity, the date, and who does what. Vague settlements are the ones that reappear as a second dispute.
- Remedy stated with quantity and value
- Deadline and the party responsible
- How completion will be verified
- Confirmed back in writing by the factory
- Filed against the order and the register
Why The Audit Failed, And Whether It Is Actually Fixed
A failed audit produces two things: a finding and a deadline. What it rarely produces on its own is a cause — and a correction applied to a symptom will hold exactly until the next audit.
Asked Before Signing A Retainer
Including the two about cost and about whose side the desk is on.
01How is this different from hiring an agent?
02What does a desk cost, and when is it not worth it?
03Where do the scorecard numbers come from?
04Will the factory cooperate with a desk measuring them?
05Can you represent us in a dispute?
06How long before any of this shows up in the numbers?
Send your supplier list and one season of inspection results.
Those two are enough to build a first scorecard and to tell you whether a retained desk is worth the fee for your volume. If it is not, we will say so — a retainer that cannot pay for itself is a bad arrangement for both sides, and it ends badly in month four rather than quietly.