INDEPENDENT COST VERIFICATION

Price Benchmarking And Cost Analysis

Independent evaluation of quoted prices against market rates, raw-material costs, and comparable factory quotes.

FABRIC
TRIMS
CM
OVERHEAD
MARGIN
FabricTrims & accessoriesCut, make, trimFactory overheadFactory margin
Illustrative composition of an FOB price for a basic cotton garment. Real shares move with the style, the fabric and the order size — which is exactly what a benchmark measures.
01 — WHERE THE MONEY GOES

What A Quoted FOB Price Is Actually Made Of

The purpose is simple: ensure the buyer pays a fair price and understands the cost structure. A quote is a single number. Underneath it sit five lines, and only one of them is usually negotiable in the way buyers assume. Benchmarking rebuilds those lines from the outside so you can see which part of the price is market and which part is markup.

50–70%
Fabric
The largest single line on most basic cotton garments, and the one that moves with yarn and cotton prices rather than with negotiation. Sources differ: some put it at 30–50% on styles where making cost dominates.
5–10%
Trims & Accessories
Labels, thread, buttons, zips, polybags and cartons. Small per line, but nominated suppliers and low volumes inflate it quietly.
15–30%
Cut, Make, Trim
Built from the standard minute value of the style, line efficiency and the wage floor. This is where a quote can be checked arithmetically rather than argued over.
~20%
Factory Margin
CBI’s 2024 costing model puts factory profit on FOB at around 20 percent. A margin well outside that range, in either direction, is worth asking about.
Why the ranges are ranges. Published cost breakdowns do not agree with each other, and they should not: a 180 GSM cotton tee and a structured outerwear piece have opposite cost shapes. Industry guides commonly place fabric at 50–70 percent of FOB for basic cotton garments, while worked examples for woven and high-make styles land closer to 50 percent or below. We do not apply a template percentage to your quote. We rebuild the sheet from your own style, consumption and volume, and tell you where the result sits against comparable work.
02 — THE BENCHMARKS

What We Compare Your Quote Against

Four independent references, read together. Any one of them alone can be argued away; together they close the room for a number that has no explanation behind it.

BenchmarkWhat It Tells YouWhere It Comes From
Raw-material indexWhether the fabric line tracks the actual cotton and yarn market, or a price fixed months ago and never revisited.Cotlook A Index and local yarn and greige quotations. The A Index stood at about USD 1.90 per kg in June 2026, against USD 1.73 a year earlier.
Comparable factory quotesWhat the same style, specification and quantity is being quoted at by other qualified factories in the same month.Live quotations gathered from comparable units, on your own tech pack rather than a generic brief.
CM build-upWhether the making cost is arithmetically defensible: standard minute value, line efficiency, operator count and the wage floor.Rebuilt from the style, then tested against the legal wage floor of Tk 12,500 per month for the entry grade.
Landed-cost viewWhether a lower FOB survives freight, duty and lead time, or quietly costs more once the goods reach you.FOB plus freight, duty and handling for your destination market.
A live variable worth watching. Bangladesh’s garment minimum wage has been Tk 12,500 per month at entry grade since 1 December 2023, with a 9 percent annual increment on basic wage applying from December 2024. A new Minimum Wage Board was formed on 1 November 2026 following sustained worker protests for a Tk 30,000 floor. Any CM figure quoted to you today was built on the current floor. Where an order runs past a revision, we say so in the report rather than letting it surface later as a price increase you did not plan for.
03 — BEFORE AND AFTER

A Quote You Can Argue With, Not Just Accept

Most negotiations fail in the same way: the buyer asks for a lower number and the factory gives one, so something invisible gets worse. Benchmarking moves the conversation to lines instead of totals.

WITHOUT A BENCHMARK

  • One number per style, with no sheet behind it
  • Fabric priced at a rate nobody can date
  • CM accepted because it “sounds about right”
  • Discount won on the total, recovered on quality
  • Nominated trim suppliers never questioned
  • Price increases arrive as a fact, not a calculation

WITH A BENCHMARK

  • A line-by-line sheet you and the factory both read
  • Fabric tested against a dated market reference
  • CM checked against minutes, efficiency and wage floor
  • Negotiation aimed at the line that is actually out
  • Trim and accessory markups surfaced separately
  • Future increases predicted before they are announced
04 — THE METHOD

How The Analysis Runs

1
Read The Spec
Tech pack, consumption, construction and order quantity — the inputs that decide the cost, before any price is discussed.
2
Rebuild The Sheet
Fabric, trims, CM, overhead and margin reconstructed independently, line by line.
3
Pull The Market
Raw-material references dated, and live quotes gathered from comparable factories on your own tech pack.
4
Find The Gap
Quote set against benchmark, line by line, with the variance named and explained rather than averaged away.
5
Hand You The Argument
A sheet you can put in front of the factory, with the questions to ask and the lines worth conceding.
05 — WHAT YOU RECEIVE

The Deliverables

Reconstructed Cost Sheet
Your style rebuilt line by line, with the assumption behind every figure written next to it, so the sheet can be challenged rather than believed.
Variance Report
Quote against benchmark, line by line, in currency and in percentage, with each gap classified as explained, questionable or unexplained.
Comparable Quote Set
What other qualified factories quoted for the same specification and quantity in the same month, with the factory names disclosed to you.
Negotiation Brief
Which lines to push, which to leave alone, what the factory will likely counter with, and the point past which quality or delivery starts paying for the discount.
Sensitivity View
How the price moves if cotton shifts, the wage floor is revised, or the order quantity changes — so the next increase is not a surprise.
Source List
Every reference dated and named, including the ones that disagree with each other, and a plain statement of what we could not verify.
Scope note. This is independent analysis, not procurement or price negotiation on your behalf. We do not take a commission on savings, we do not hold a position in any factory we benchmark against, and we do not quote you a target price we cannot show the working for. Where a line cannot be verified from the outside — a genuinely proprietary finish, an exclusive mill rate — the report says so instead of estimating it.
06 — FAQS

Price Benchmarking FAQs

It is an independent evaluation of a quoted price against market rates, raw-material costs and comparable factory quotes. Rather than asking whether a number feels high, it rebuilds the cost sheet from the outside — fabric, trims, cut-make-trim, overhead and margin — and shows which lines are consistent with the market and which are not. The output is a sheet you can put in front of the supplier, not an opinion.

An open cost sheet is the factory’s own account of its costs, and it is useful. But it is supplied by the party being questioned, built on its own fabric rates and its own efficiency assumptions. Benchmarking is reconstructed independently and then compared with the factory’s version. Where the two agree, you have confirmation. Where they diverge, you have a specific question rather than a general suspicion. The two work best together.

For basic cotton garments, industry costing guides most commonly place fabric at 50 to 70 percent of the FOB price, making it the largest single line. The figure is lower on styles where making cost dominates — structured, multi-operation or heavily finished garments — where published worked examples land closer to 50 percent or below. Published sources genuinely disagree, which is why a template percentage applied to your quote proves nothing. The share has to be rebuilt from your own consumption and construction.

Yes, and this is the line that can be checked arithmetically rather than argued over. Cut-make-trim is built from the standard minute value of the style, the line efficiency the factory actually achieves, the operator count and the wage cost per minute. Each of those can be reconstructed and tested. A CM quote that cannot be traced back to minutes and efficiency is a number, not a cost.

Probably, if your order runs past it. The garment minimum wage has been Tk 12,500 per month at entry grade since 1 December 2023, with a 9 percent annual increment on basic wage from December 2024. A new Minimum Wage Board was formed on 1 November 2026 after sustained worker protests for a Tk 30,000 floor. Labour sits inside the CM line rather than across the whole price, so a wage revision does not move FOB by the same proportion. We model the effect on your specific style so the increase arrives as a calculation you already expected.

No. FOB covers the goods to the port of loading and nothing beyond it, so freight, duty, handling and lead time all sit outside the quote. A lower FOB from a factory with longer lead times or weaker on-time performance can cost more once airfreight on a late shipment, markdowns or a missed season are counted. We report the landed view alongside the FOB comparison for exactly this reason.

No. We are not a buying agent and we take no commission on savings, because a fee tied to the reduction would give us a reason to push a number past where it should go. We give you the reconstructed sheet, the variance against benchmark and a brief on which lines to press and which to leave alone. The conversation with your supplier stays yours.

It depends on how much of the specification already exists. With a complete tech pack and a quote in hand, rebuilding the sheet and dating the raw-material references is quick. Gathering live comparable quotes from qualified factories is the part that takes real time, because the comparison is only worth anything if the other factories are quoting on your actual specification and quantity rather than a generic brief.

Send us one quote and one tech pack
We will rebuild the cost sheet, date the raw-material references and tell you which line is out and by how much — before you reply to the factory.